Post by Franko10 ™ on Jul 14, 2005 11:41:32 GMT -5
News Releases - Thursday, July 14, 2005
Drilling Update at Moore Lake
=======================================================================
July 14, 2005 - JNR Resources Inc. (TSX-V:JNN) the 'Company' and
International Uranium Corporation (IUC); jointly the "Companies" are
pleased to provide an update on the 2005 summer diamond drilling
program underway on the Moore Lake uranium project, located in the
Athabasca Basin of Northern Saskatchewan.
The 15,000-metre program is in progress with three drill rigs currently
operating. Approximately 3,500 metres have been completed so far in 8
holes. Samples have been received by SRC laboratories and interim
results are expected within the next few weeks.
The drill program is testing a multitude of targets along the Maverick
structural corridor, which has now been interpreted to extend over a
minimum strike length of 6.5 kilometres, as well as ground EM targets
along a newly identified 10-kilometre long, 500-metre wide conductive
corridor, which covers the interpreted western and northern contacts
between the Maverick granite and the Lower Wollaston sediments.
The Maverick Zone, discovered in April 2000, is located in the prolific
eastern sector of the Athabasca Basin. High-grade uranium
mineralization within the zone has been discovered at relatively
shallow depths of approximately 270 metres.
All technical information for the Company's exploration projects is
obtained and reported under a formal quality assurance and quality
control program. JNR's president, Richard T. Kusmirski, PGeo, and
exploration manager, David L. Billard, PGeo, are the qualified persons
responsible for the technical data presented in this release. Details
of the Company's quality assurance and quality control program are
presented within a material change report filed on SEDAR on December 2,
2004, and on the Company's website at www.jnrresources.com.
ON BEHALF OF THE BOARD
"Rick Kusmirski'
Rick Kusmirski
President
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.
=======================================================================
Copyright (c) 2005 JNR RESOURCES INC. (JNN-TSXV) All rights reserved.
For more information visit our website at www.jnrresources.com/
or send mailto:info@jnrresources.com
Message sent on Thu Jul 14, 2005 at 8:58:52 AM Pacific Time
Drilling Update at Moore Lake
=======================================================================
July 14, 2005 - JNR Resources Inc. (TSX-V:JNN) the 'Company' and
International Uranium Corporation (IUC); jointly the "Companies" are
pleased to provide an update on the 2005 summer diamond drilling
program underway on the Moore Lake uranium project, located in the
Athabasca Basin of Northern Saskatchewan.
The 15,000-metre program is in progress with three drill rigs currently
operating. Approximately 3,500 metres have been completed so far in 8
holes. Samples have been received by SRC laboratories and interim
results are expected within the next few weeks.
The drill program is testing a multitude of targets along the Maverick
structural corridor, which has now been interpreted to extend over a
minimum strike length of 6.5 kilometres, as well as ground EM targets
along a newly identified 10-kilometre long, 500-metre wide conductive
corridor, which covers the interpreted western and northern contacts
between the Maverick granite and the Lower Wollaston sediments.
The Maverick Zone, discovered in April 2000, is located in the prolific
eastern sector of the Athabasca Basin. High-grade uranium
mineralization within the zone has been discovered at relatively
shallow depths of approximately 270 metres.
All technical information for the Company's exploration projects is
obtained and reported under a formal quality assurance and quality
control program. JNR's president, Richard T. Kusmirski, PGeo, and
exploration manager, David L. Billard, PGeo, are the qualified persons
responsible for the technical data presented in this release. Details
of the Company's quality assurance and quality control program are
presented within a material change report filed on SEDAR on December 2,
2004, and on the Company's website at www.jnrresources.com.
ON BEHALF OF THE BOARD
"Rick Kusmirski'
Rick Kusmirski
President
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.
=======================================================================
Copyright (c) 2005 JNR RESOURCES INC. (JNN-TSXV) All rights reserved.
For more information visit our website at www.jnrresources.com/
or send mailto:info@jnrresources.com
Message sent on Thu Jul 14, 2005 at 8:58:52 AM Pacific Time