Post by Franko10 ™ on Oct 7, 2004 18:12:53 GMT -5
Placer Dome Ramps Up Exploration at Madsen
Placer Dome Canada Limited ("Placer") has significantly increased exploration activity on Claude Resources Inc. ("Claude") Madsen property in Red Lake, Ontario as a result of a number of high grade intersections. To date in 2003, thirty-six holes totalling about 20,000 metres have been drilled on multiple target areas (Russett North, Devilliers, Creek, Footwall Tuff and Mine East).
Results from the Russett North zone are particularly encouraging with quartz-tourmaline, quartz-carbonate and colliform carbonate veining being intersected routinely. Visible gold ("VG") was observed in a number of holes with several returning assays that confirm the high-grade nature of this carbonatized mafic-ultramafic terrain. The Phase II expansion drilling (100-metre centres) of the Russett North zone started to vector in on a segment of this terrain referred to as the Treasure Box. Building on encouraging results from the 2002 drill program (see March 24th, 2003 press release on Claude’s website), another three holes within this corridor encountered significant intersections in terms of both grade and width (see table below).
RUSSETT NORTH/TREASURE BOX
Drill Hole From (m) To (m) Interval Grade (gpt) VG Comments
PDM03-27 107.04 108.29 1.25 3.22 Quartz-tourmaline veining
PDM03-27 111.04 112.26 1.22 9.86 Quartz-tourmaline veining
PDM03-27 332.62 335.06 2.44 7.59 Yes Quartz-carbonate veining
PDM03-27 343.17 344.39 1.22 4.07 Quartz-carbonate veining
PDM03-29 74.45 75.52 1.07 4.31 Colliform carbonate veining
PDM03-29 80.70 84.94 4.24 17.81 Yes Quartz-tourmaline veining
PDM03-30 321.01 322.10 1.10 1.12 Quartz-epidote stringer
PDM03-30 344.48 346.03 1.55 21.10 Yes Quartz-pyrite
PDM03-32 164.63 165.85 1.22 1.13 Yes Vein
PDM03-32 510.76 511.52 0.76 3.63 Yes Vein, tourmaline
PDM03-33 328.51 329.15 0.64 1.09 Quartz veining
Elsewhere on the property, Phase I drilling near the past-producing Starratt-Olsen mine, intersected known Devillier & Creek zones as well as a new sheared and altered sulfide replacement zone in the mine’s footwall which was named the Footwall Tuff zone. Results from this target area are listed in the ensuing table. The significance of this new zone will be assessed in subsequent drill phases.
Zone Project Drill Hole From (m) To (m) Interval Grade (gpt) VG Comments
Devilliers PDM03-150 131.71 132.84 1.13 1.51 Sulfide replacement
Devilliers PDM03-150 137.86 146.52 8.66 1.24 Sulfide replacement
including PDM03-150 137.86 140.43 2.56 3.26 Yes Quartz veining
Footwall Tuff PDM03-150 455.61 456.52 0.91 3.27 Sulfide replacement
Footwall Tuff PDM03-150 458.66 460.00 1.34 1.27 Sheared Tuff/sulfide
Creek PDM03-151 112.84 113.14 0.30 1.55 Sulfide replacement
Footwall Tuff PDM03-151 326.62 327.23 0.61 2.87 Epidote veining
Footwall Tuff PDM03-151 339.94 345.09 5.15 1.63 Yes Sulfide replacement
including PDM03-151 343.90 344.81 0.91 5.13 Yes Sulfide replacement
Devilliers PDM03-154 166.55 167.77 1.22 8.55 Yes Quartz veining
Creek PDM03-156 122.71 123.57 0.86 1.78 Sulfide replacement
Momentum for the Madsen project is building as evidenced by a number of key infrastructure improvements including the construction of a 5.5-kilometre, all season, access road to the Russett North area and by increasing project personnel to 14 geologists and support staff to handle the enormous volume of core generated by the project. In excess of twenty kilometres of core has been drilled in 2003, however, about one third of the drill holes have yet to be logged, assayed and reported in their entirety.
Placer has undertaken extensive geophysics and 3D modeling of the Madsen property and will initiate a major trenching program shortly on the Treasure Box area prior to beginning Phase III drilling (25-50 metre centers) later this fall.
Placer Dome has the right to earn a 55% interest in Claude’s 10,500-acre Madsen property by spending CDN $8.2 million prior to the end of 2004 and delivering a bankable feasibility study over the following two years.
Assaying and associated quality control of the Madsen core was done by Chemex Laboratories under the supervision of Yuri Dobrotin, P. Geo., Placer Dome District Geologist.
2003 Madsen Drilling Locations (click map for larger version)
Treasure Box Drilling Locations (click map for larger version)
Starratt-Olsen Drilling Locations (click map for larger version)
For further information please contact:
Philip E. Olson, P.Geo
Vice President, Exploration
306.668.7505
Neil McMillan
President
306.668.7505
Placer Dome Canada Limited ("Placer") has significantly increased exploration activity on Claude Resources Inc. ("Claude") Madsen property in Red Lake, Ontario as a result of a number of high grade intersections. To date in 2003, thirty-six holes totalling about 20,000 metres have been drilled on multiple target areas (Russett North, Devilliers, Creek, Footwall Tuff and Mine East).
Results from the Russett North zone are particularly encouraging with quartz-tourmaline, quartz-carbonate and colliform carbonate veining being intersected routinely. Visible gold ("VG") was observed in a number of holes with several returning assays that confirm the high-grade nature of this carbonatized mafic-ultramafic terrain. The Phase II expansion drilling (100-metre centres) of the Russett North zone started to vector in on a segment of this terrain referred to as the Treasure Box. Building on encouraging results from the 2002 drill program (see March 24th, 2003 press release on Claude’s website), another three holes within this corridor encountered significant intersections in terms of both grade and width (see table below).
RUSSETT NORTH/TREASURE BOX
Drill Hole From (m) To (m) Interval Grade (gpt) VG Comments
PDM03-27 107.04 108.29 1.25 3.22 Quartz-tourmaline veining
PDM03-27 111.04 112.26 1.22 9.86 Quartz-tourmaline veining
PDM03-27 332.62 335.06 2.44 7.59 Yes Quartz-carbonate veining
PDM03-27 343.17 344.39 1.22 4.07 Quartz-carbonate veining
PDM03-29 74.45 75.52 1.07 4.31 Colliform carbonate veining
PDM03-29 80.70 84.94 4.24 17.81 Yes Quartz-tourmaline veining
PDM03-30 321.01 322.10 1.10 1.12 Quartz-epidote stringer
PDM03-30 344.48 346.03 1.55 21.10 Yes Quartz-pyrite
PDM03-32 164.63 165.85 1.22 1.13 Yes Vein
PDM03-32 510.76 511.52 0.76 3.63 Yes Vein, tourmaline
PDM03-33 328.51 329.15 0.64 1.09 Quartz veining
Elsewhere on the property, Phase I drilling near the past-producing Starratt-Olsen mine, intersected known Devillier & Creek zones as well as a new sheared and altered sulfide replacement zone in the mine’s footwall which was named the Footwall Tuff zone. Results from this target area are listed in the ensuing table. The significance of this new zone will be assessed in subsequent drill phases.
Zone Project Drill Hole From (m) To (m) Interval Grade (gpt) VG Comments
Devilliers PDM03-150 131.71 132.84 1.13 1.51 Sulfide replacement
Devilliers PDM03-150 137.86 146.52 8.66 1.24 Sulfide replacement
including PDM03-150 137.86 140.43 2.56 3.26 Yes Quartz veining
Footwall Tuff PDM03-150 455.61 456.52 0.91 3.27 Sulfide replacement
Footwall Tuff PDM03-150 458.66 460.00 1.34 1.27 Sheared Tuff/sulfide
Creek PDM03-151 112.84 113.14 0.30 1.55 Sulfide replacement
Footwall Tuff PDM03-151 326.62 327.23 0.61 2.87 Epidote veining
Footwall Tuff PDM03-151 339.94 345.09 5.15 1.63 Yes Sulfide replacement
including PDM03-151 343.90 344.81 0.91 5.13 Yes Sulfide replacement
Devilliers PDM03-154 166.55 167.77 1.22 8.55 Yes Quartz veining
Creek PDM03-156 122.71 123.57 0.86 1.78 Sulfide replacement
Momentum for the Madsen project is building as evidenced by a number of key infrastructure improvements including the construction of a 5.5-kilometre, all season, access road to the Russett North area and by increasing project personnel to 14 geologists and support staff to handle the enormous volume of core generated by the project. In excess of twenty kilometres of core has been drilled in 2003, however, about one third of the drill holes have yet to be logged, assayed and reported in their entirety.
Placer has undertaken extensive geophysics and 3D modeling of the Madsen property and will initiate a major trenching program shortly on the Treasure Box area prior to beginning Phase III drilling (25-50 metre centers) later this fall.
Placer Dome has the right to earn a 55% interest in Claude’s 10,500-acre Madsen property by spending CDN $8.2 million prior to the end of 2004 and delivering a bankable feasibility study over the following two years.
Assaying and associated quality control of the Madsen core was done by Chemex Laboratories under the supervision of Yuri Dobrotin, P. Geo., Placer Dome District Geologist.
2003 Madsen Drilling Locations (click map for larger version)
Treasure Box Drilling Locations (click map for larger version)
Starratt-Olsen Drilling Locations (click map for larger version)
For further information please contact:
Philip E. Olson, P.Geo
Vice President, Exploration
306.668.7505
Neil McMillan
President
306.668.7505